Global Case Studies - Russia
Capstone Installations:
Russia
-
Trolza ECObus-5250 – HEV
Rather than operating on electricity directly from the utility or an internal combustion engine like many European hybrids, Trolza ECObus-5250 buses are powered with batteries charged by onboard Capstone C65 MicroTurbines.
Download the Case Study
-
Yarmarka Shopping Center, City of Ukhta, Republic of Komi – Retail
Eleven natural gas-fueled microturbines provide all power and heat to the 30,000-square-meter (323,000-square-foot) Russian shopping mall and accompanying warehouse.
Download the Case Study
-
Yakutcement Cement Manufacturing Facility, Yakutia – Manufacturing
At the Yakutcement Cement Manufacturing Facility in Russia, two Capstone C1000 Power Packages provide reliable heat and power to the plant while heating several village buildings.
Download the Case Study
-
Sport Center Igora, Leningrad region, St. Petersburg – Hospitality
Thirty-eight Capstone microturbines provide the luxury ski resort, Sport Center Igora in Russia — 54 kilometers (34 miles) from the nearest powerline — with all its power needs at this CHP application.
Download the Case Study
-
Sakha-Torg, Yakutsk, Russia – Other
Five C60 MicroTurbines provide electricity and heating for shopping malls, offices, and warehouses in Yakutsk, Russia.
Download the Case Study
0.08 |
May 24 2013 |
16:00 ET

